Product Description
CSA polymer modified cementitious waterproofing coat,waterproofing agent
General description
CSA Polymer modified Cementitious Waterproof Coating is a two-component Polymer modified Cementitious Waterproof material composed of dry powder and emulsion, and precisely mixed with high-quality cement, grounded hard filler and additive in factories. It bond permanently with base materials. Excellent adhesive ability, flexibility, durability and water-resistance, so it can be used widely in various kinds of waterproofing projects..
Specification
(According to standard JC/T894-2001《Polymer modified Cementitious Waterproof Coating》,||)
Testing items
|
Technical Data
|
Solid Content,% ≥
|
65
|
Drying time
|
Tack-free time, h ≤
|
4
|
Practical drying time, h ≤
|
8
|
Tensile strength, MPa
|
No treatment ≥
|
1.8
|
Conservation after heating ≥
|
80
|
Conservation afteralkali treatment ≥
|
80
|
Conservation afterUV treatment ≥
|
80
|
Elongation
at break,%
|
No treatment ≥
|
80
|
Heating treatment ≥
|
65
|
Alkali treatment ≥
|
65
|
UV treatment ≥
|
65
|
Water impermeability
(30min,0.3MPa)
|
impermeable
|
Wet Substrate bond strength, MPa ≥
|
1.0
|
Impermeability(negative),MPa ≥
|
0.6
|
Properties:
1. Good flexibility can cover minuteness crack caused by various reasons.
2. Excellent adherence with surface of concrete and bricks.
3. Easily used by trowel and spatula, no leaking while uprightness.
4. Can be applied to wet surface or freshly placed concrete.
5. Good weatherability and UV resistance.
6. Can be applied to both the external and internal walls, bearing high water pressure whenever positive or negative.
7. Environmental product without toxin, smelling, pollution, radioactivity.
Typical uses
1. Base materials waterproofing of concrete, brickwork,, pre-cast concrete and floating brick, etc.
2. Waterproofing of building wall, floor and roof.
3. Waterproofing projects of underground car park, tunnel, drainage and water supply pipes, swimming pool and drinking water pool, etc.
4. Other waterproofing projects.
Application:
Substrate preparation
The substrate should be flat, no oil slicks, release agent, dust and other loosen material which influence coherence.
The concrete fallen off or loosening have to be removed, and the larger holes, cracks should be repaired first.
It’s better for the inside corner and outside corner to be arc angle.
The surface of freshly placed concrete should be dry completely prior to commencement of construction.
It’s better to deal with substrate by mix(emulsion : water = 1:1)before brush, especially for the loose one.
Wet basal surface
To wet basal surface thoroughly, operation can be processed after water is completely infiltrated into concrete and without left.
Mixing
First, dump emulsion into the clean container, then start to use electric blenders;Put dry powder slowly in appropriate proportion(powder components : emulsion = 1 : 0.6),blending completely to equality dope without agglomeration(about 4-5min) .It must be used up in the recommended time(about 1 hour).
Application
Spread slurry on the basal surface which treated well by coating knife or spatula. According to the requirement brush at least 2 layers (total thickness of 1.5-2.0mm). Until the first layer slightly dry (touch free) can make the second which depending on the substrate density, temperature and humidity in 1- 3 hours.
Dosage Estimates
Packing
Powder component 25kg/ bag
Emulsion 15kg/barrel
Dosage:1.5~1.7kg/㎡.mm
Tips of Usage
Polymer Modified Cementitious Waterproof Coating requires 5 ~ 45°C and relative humidity less than 85% of the ventilation condition. If the temperature is below 5°C or rainy day, it can’t be applied There will be discrepancy of its color caused by the density and humility of working surface. Be attention to prevent from rain, strong sunlight or froze first two days. Tools and equipments should be cleaned after working in time.
Storage
It should be stored in a dry place, and have a shelf live at least 6 months with original package.
Payment Terms︰
T/T,L/C
Product Image